갤러리 스타일3

함께 나누는 케이테마 입니다. 언제나 변화와 차별화, 창의적인 디자인을 향해 도전하고 있습니다.

갤러리 스타일3

Visual Portfolio, Posts & Image Gallery for WordPress

img_gallery_11

Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in close contact with the client every step of the way. As often happens throughout a scheme, changes were requested and implemented throughout the duration without impeding the programme.

헤리 하임스 소사이티

Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in...

img_gallery_22

Building Interiors completed a full strip out of the existing building and installed the agreed Design & Build scheme to the high standard that HH Global required.

텐그레이 리조트

Building Interiors completed a full strip out of the existing building and...

img_gallery_14

Weekly process meetings were held in order to show the client how the scheme was progressing . The project was successfully delivered on time and on budget by the Building Interiors internal team.

크레인위크 솔루션

Weekly process meetings were held in order to show the client how...

img_gallery_7

The traditional outdated typical warehouse office consisted of bare block walls, limited light levels, and a very uninspiring space!

큐올레인 사운드

The traditional outdated typical warehouse office consisted of bare block walls, limited...

banner_900_900_30

Kevin Edwards chose Building Interiors to design and deliver their brand-new building in Leeds. They are a fast paced, dynamic young company and wanted their office to reflect this. The brief was to accommodate quite a lot into a relatively small space;- co-working space, wellbeing area, conference and meeting spaces, bar, games area as well as the all-important workstations for up to 40 people. It was important to them that the building be a professional space which could also be used by staff to socialise and enjoy themselves.

케빈 에드워드 빌딩

Kevin Edwards chose Building Interiors to design and deliver their brand-new building...

img_gallery_17

Our client tendered this project through CBRE and we were successful in developing the concept design to a full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.

엑시로 시스템

Our client tendered this project through CBRE and we were successful in...

img_gallery_15

The client really wanted an industrial look but the space was very modern. We helped achieve this look through the use of a dark colour scheme, black brick and steel finishes.

아이번 빌딩

The client really wanted an industrial look but the space was very...

img_gallery_18

Building Interiors complied with all idea boilers rigorous health and safety requirements. Through partnering with their on-site team we successfully completed all designs and installations as required.

아이들 보이어

Building Interiors complied with all idea boilers rigorous health and safety requirements....

img_gallery_20

To be completed without interrupting the use of toilets for the office block.

아발론 공간디자인

To be completed without interrupting the use of toilets for the office...

img_gallery_6

Refurbishment of ground floor and first floor offices including changes to the reception area. An industrial theme was adopted in places which including stripping out a suspended ceiling and utilising natural products where possible.

빅토리아 플라임

Refurbishment of ground floor and first floor offices including changes to the...

img_gallery_21

Amongst all standard trades this project included: Ceilings, M&E Works, partitioning, decorating, bespoke joinery and collaboration features.

브라이스 리즈트

Amongst all standard trades this project included: Ceilings, M&E Works, partitioning, decorating,...

img_gallery_26

A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.

모나칸 스테이션

A lot of the details could not be determined until after the...